SPP Module (198.56 kWp)

Modul AD
Client
198.56 kWp
Total power (peak) of the PV system
-
Area of the PV system
3
Number of inverters
-
Slope of PV modules (relative to the horizon)
Byala
Settlement
East 900, West 2700
Placement of PV modules
584
Number of PV modules
230.7 MWh/year
Production of the PV system
1159 kWh/kWp
PV System Production Spec