ENERGO-PRO specialists replaced an underground cable in a section of the 10-kilovolt power line “Acacia” in Gorna Oryahovitsa. The route between substation “Acacia” and substation “Vihar” was built with cable of old type, which due to the manufacturing technology, after years of operation begins to give defects. When measurements were made, it was found that the cable was no longer reliable, and a possible breakdown could disrupt the operability of the circuit and the reliability of the power supply in sq. “Spring”.

The specialists of ENERGO-PRO Networks took the necessary actions to replace the cable, preparing a project, and the company provided a budget. The new cable line has already been put into operation. The length of the track is 290 m, and the cable laid is 915 m. The cost of the project amounts to BGN 14,650.