The teams of ENERGO-PRO Grids prepared the electrical facilities on the territory of Ruse region for operation in winter
The teams of ENERGO-PRO Networks - Regional Center Ruse prepared for work in the autumn-winter season the facilities of the electricity distribution network on the territory of the district. On a daily basis, electricians performed all the necessary servicing of overhead power lines, substations and electrical switchboards to ensure reliable power supply during severe weather conditions.
Specialists of the company replaced outdated wires in vulnerable sections of the network with twisted insulated ones and installed new boards. Twisted insulated wires are more durable in winter conditions and less attractive to encroachments. The electrical installers of ENERGO-PRO Grids also replaced insulators, reworked connections, adjusted wire overhangs and cleaned the routes of overhead lines from tree branches.
Regular maintenance of the facilities increases the reliability and security of electricity supply to thousands of households and business objects in Ruse and the region.

