No items found.

ENERGO-PRO renovated the electricity distribution network in “Sveti Nikola” area in Varna

Posted on
19.9.2016
Author
ENERGO-PRO
Time to read
Blog article hero imageBlog article hero image

Varna district “Briz” in the area of “St. Nicholas” has a more secure power supply after the renovation of a low-voltage overhead line. ENERGO-PRO Networks invested BGN 112,000 in the implementation of the project. The reconstruction included the installation of 42 new reinforced concrete pillars and the installation of 5,155 meters of twisted insulated wire.

The newly built air line provides a more reliable power supply to residents in the area and minimizes the risks of accidents even during the winter months. Mounted twisted wires are more resistant to severe weather conditions such as heavy rains, storms and snowdrifts. The insulation of the facilities has also been completely replaced.

The implementation of the project also includes the export of 49 electricity meters at the border of the property and the installation of 123 new electricity meters, which guarantees permanent access to the company's specialists for regular reporting of the consumed electricity.

ENERGO-PRO Networks maintains and serves 42,492 km of high, medium and low voltage power distribution network in a licensed territory of 30,000 sq. km, which covers 9 administrative districts in North-East Bulgaria - Varna, Veliko Tarnovo, Gabrovo, Dobrich, Razgrad, Ruse, Silistra, Targovishte and Shumen.