No items found.

ENERGO-PRO replaced 1540 meters of overhead electric wires in the village of Aydemir

Posted on
18.2.2015
Author
ENERGO-PRO
Time to read
Blog article hero imageBlog article hero image

Employees of ENERGO-PRO Networks carried out reconstruction of a low-voltage network in the Silistra village of Aydemir, in the area of the substation “Kindergarten”. Teams of the company replaced reinforced concrete pillars and 44 interstairs with a new twisted, insulated wire with a total length of 1540 m.

ENERGO-PRO specialists also replaced record-breaking deviations in places where the insulation of the old ones was cracked in order to avoid the risk of occurrence of power supply disruptions. The reconstruction is part of the repair program of the company and is worth nearly 20 thousand leva.

The stability of the electricity distribution network is a prerequisite for the development of any settlement. Numerous manufacturing enterprises operate in the Aidemir region, which create jobs. The village has a strategic geographical location - it is located in Northeastern Bulgaria and passes through it the republican road connecting Silistra with Ruse.

The reconstruction of the section of the power grid will significantly improve the quality and security of electricity supply to 72 households and enterprises in the village.